          中嘉汽車制造(成都)有限公司

          當前所在位置:首頁 >> 我們的客戶 >>  中嘉汽車制造(成都)有限公司

          沃爾沃汽車成都工廠焊裝車間Hood項目機電改造

          中嘉汽車制造成都有限公司(沃爾沃成都工廠)

          焊裝車間Hood項目機電改造完工報告

           China automotive manufacturing Chengdu Co., Ltd. (Volvo Chengdu factory)From September 21, 2018 to October 14th, during the National DayCompletion report of electromechanical transformation of Hood project in welding workshop

          1、 工作計劃及完成內容情況/ Work plan and content

          序號NO

          項目名稱

          entry name

          施工區域Construction area

          工作內容Job conten

          完成時間Completion time

          壯態

          Strong state

          1

          天然氣管道輔設及輔助設備安裝/

          廠區內及車間內

          天然氣管道敷設安裝

          20181013

          已經完成

          2

          給排水管道安裝

          焊裝車間內

          給排水管道安裝

          20181013

          已經完成

          3

          電氣敷設安裝

          焊裝車間內

          橋架及電纜安裝;

          2018105

          已經完成

          4

          壓縮空氣管道安裝

          焊裝車間內

          壓縮空氣支管焊接安裝

          20181028

          計劃完成

          2、 各分項施工照片匯總報告

          2.1、天然氣管道輔設及輔助設備安裝施工照片/ Installation and auxiliary equipment installation of natural gas pipeline 

          2.2、焊接車間HOOD項目給水管道安裝照片匯總/Photo sink for installation of water supply pipe in welding workshop HOOD project

           

          2.3、焊接車間HOOD項目電氣敷設安裝照片匯總/ Summary of electrical installation and installation of HOOD project in welding workshop

          2.4、焊接車間HOOD項目壓縮空氣管道待10月28日施工完成照片匯總/

          3、施工單位施工檢查記錄報告:

                我供應商嚴格按貴方在國慶節期間的技術改造要求進行現場施工處理。在實施過程中進行了現場監督管理(附以下現場照片),其施工內容按方案要求進行規范改造施工,施工時每一個施工節點的附屬安全防護設施及施工工藝流程操作均符合國家建筑工程施工規范的相關規定要求。

               經檢查驗收,各施工節點主控項目及一般項目均符合要求,施工質量檢查合格,為業主方交上合格改造項目保證生產的正常運行。

          Our suppliers strictly carry out on-site construction according to your technical transformation requirements during the national day. During the implementation process, the site supervision and management (with the following site photos) were carried out, and the construction contents were standardized according to the requirements of the scheme. The auxiliary safety protection facilities and construction process operation of each construction node met the relevant requirements of the national construction code.

          After inspection and acceptance, the main control projects and general projects of each construction node meet the requirements, and the construction quality inspection is qualified


                        

           
          Copyright 2008 四川省合眾萬榮建設有限公司 版權所有 All rights reserved.

          蜀ICP備09043147號 | Powered by united wanrong

           

          亚洲欧美乱码一区二区_无码亚洲中文字幕综合色_免费人妻无码不卡中文字幕系_日韩有码视频在线观看
              1. <track id="6ov4g"><div id="6ov4g"></div></track>
                <tbody id="6ov4g"><span id="6ov4g"><td id="6ov4g"></td></span></tbody>